Football Field design complete
Today I finished the drawing of the football themed design. For this project I kept track of the hours involved in each stage of the process.
Software design in VCarve Pro: 4 hours
Laser file preparation in RDWorks: 2 hours
Laser prep, alignment check, test run and design run: 5 hours
Stencil cleaning, tape removal and review: 1 hour
Sketch book color planning; 1 hour
Drawing: 3.5 hours
Blogging at various stages: 2.5 hours
Total: 19 hours
![]() |
9 pens for the drawing |
![]() |
sketch book |
![]() |
Football Field and Stadium |
No comments:
Post a Comment